Bring the team together.
Coordinate mining, processing, infrastructure and other workstreams. Track deliverables, schedules, actions and information requests so each consultant knows what the study needs next.
Confidential. Coordinated. Connected.
AI-Assisted Study Management
We coordinate your consultants and use AI to integrate their technical reports into one continuously maintained study. AI connects the evidence, benchmarks assumptions, flags inconsistencies and brings the document and financial model together in a confidential project environment.
AI does the integration. Your team retains control.
Confidentiality comes first
Unpublished geology, mine plans, testwork, costs and consultant reports belong in a controlled project environment. We agree how information is hosted, processed and accessed before it enters the AI workflow.
Discuss confidential deploymentA locally deployed language model can be configured so confidential project files do not need to be processed by an external AI provider. Hosting, infrastructure and any external services are agreed for your project.
Connect permitted documents, revisions and correspondence in a private workspace, with client-controlled permissions and logs configured for the engagement.
Keep the working study environment alongside your existing data room. Agree which documents and outputs may be shared with consultants, directors, investors or other external parties.
From specialist input to an integrated study
Consultants provide the specialist work. AI reads, connects, checks and drafts across those inputs. OnlyDiggers manages the workflow, follows up exceptions and brings decisions back to the project team.
Coordinate mining, processing, infrastructure and other workstreams. Track deliverables, schedules, actions and information requests so each consultant knows what the study needs next.
AI extracts and integrates consultant reports, tables and technical findings into the Scoping Study, PFS or DFS draft. It connects each material assumption to its source and revision.
AI compares assumptions across disciplines, checks data against suitable mining benchmarks and highlights contradictions, gaps and unusual values for clarification.
Bring revised technical inputs into the study and financial model. Assess sensitivities and scenarios, record outstanding decisions and prepare concise management briefings.
A step change in study quality
AI brings a broad foundation of mining knowledge across geology, mine planning, metallurgy, engineering and project economics. We combine that knowledge with your evidence, structured checks and relevant benchmarks to examine how the parts of the study fit together.
A change in throughput can affect the mine schedule, process design, infrastructure, costs and economics. The value is in checking those relationships repeatedly as the study evolves.
See the workflow on a demonstrationCompare production schedules, plant throughput, recovery assumptions, product specifications and cost bases. Make conflicting units, currencies, dates and scenarios visible.
Compare technical and economic assumptions with relevant mining projects and available evidence, accounting for study stage, scale, location and process route. Flag exceptions for investigation.
Trace material inputs and conclusions to their source reports and revisions. Record missing evidence and unresolved disagreements in action and decision registers.
Use the maintained financial model to test material technical changes and scenarios. Bring the economic effect into the study narrative and management discussion.
One service. The complete integration layer.
Confidential project knowledge, consultant coordination, assumption checks, report integration and financial modelling sit within the same study-management service. Scope follows your study stage, programme and workstream complexity.
View Scoping Study & PFS optionsPut your study to the test
Do mine schedules, plant assumptions, infrastructure and costs share one agreed basis?
Discuss this question ↗Can you see the benchmark, the supporting evidence and the reason an exception was raised?
Discuss this question ↗Are the executive summary, technical chapters, risk discussion and financial model aligned?
Discuss this question ↗
Start with your study
Discuss your project stage, confidentiality requirements and current workstreams. Request a demonstration of report integration, benchmarking and the maintained study workflow.